top of page

Electrical Unit

ELECTRICAL FAULT DETECTION
KITCHEN COUNTERTOP LIGHTING BULB AND TRANSFORMER REPLACEMENT
FAILED SOCKET, COMMITTER SWITCH CHANGE
PANEL CONNECTION AND INSTALLATION OF THE CELLERY LIGHTING LINE WITH PULL OUT LINE
REPLACEMENT OF THE FUSE AND LEAKAGE CURRENT RELAY INSIDE THE PANEL
BATHROOM ASPIRATOR CHECK/REPLACEMENT
1
2
3
4
5
6
DURATION OF STAY IN THE APARTMENT
10 min.
20 min.
10 min.
10 min.
20 min.
20 min.
INTERIOR TECHNICAL WORKS LIST
bottom of page
